This is to inform that all the final year CSE students who are working on MAIN PROJECT has to complete the project execution by 25th March as per their Curriculum and has to submit the final Project Report to the Department by 30th March, 2011 with Internal Guide and Hod sir Signature's.without fail.

The late submission of report will not be accepted.

1.) All the students are also advised to verify the execution of both Mini and Major Projects and be

prepared by 30th March, 2011. The dates for Viva will be announced with short notice.

2.) Execution of Major Project has to be shown to Internal Guide by 25th March, 2011.

3.) Spiral binded rough copy of the report should be submitted to Internal Guide for verification.

Only on Approval by Internal Guide, final report has to be prepared and binded.

4.) Both Internal Guide and HOD Signature to be taken by 30th March, failing which report will

not be accepted.

5.)Two copies of final report per group are to be submitted with CD containing Project

Documentation, Software, Source Code, Executable copy, PPT, Procedure for installation and

execution must be stored in folder. Group members Roll numbers and names must be written

on CD before submission to respective Internal Guide’s.